2. Construction of Irrigation Canal and Intake Structure at Crabwood Creek, Region No.6 Lots 1-4 Lot 1- Section 1 (EE: $107,960,000) Lot 2- Section 2 (EE: $107,960,000) Lot 3- Section 3 (EE: $107,960,000) Lot 4- Intake Structure (EE: $16,158,600) · ProcuraGY